
About the Project
Increased airport passenger capacity from 4.2 million to 12.2 million with the construction of the new terminal.
Project Details
Client
The Bases Conversion and Development Authority (BCDA)
Location
Clark Freeport, Zone, Pampanga
Scope of Work
Build-Transfer
Contractor
Megawide-GMR Construction Joint Venture, Inc. (MGCJV)
Status
Completed
More Infrastructure Projects
177MWP Solar Bolbok 1 & 2
Tags: Ongoing
Solar power facilities for CREC, advancing clean energy generation and strengthening the Philippines’ renewable energy capacity.
Caticlan Airport Passenger Terminal
Tags: Ongoing
The Caticlan Airport Passenger Terminal is a modern airport facility that enhances the passenger experience through expanded terminal spaces, improved operational efficiency, and increased capacity, supporting tourism and regional connectivity to Boracay.
Metro Manila Subway Project (MMSP CP104)
Tags: Ongoing
Part of the Philippines’ first underground railway, MMSP CP104 covers the construction of the Ortigas and Shaw Boulevard stations and 3.4 km of twin tunnels.

